
KV-5Development began in June 1941 at the Leningrad Kirov Plant and was completed by August, but plans were interrupted due to the complicated situation on the front. The KV-5 was to utilize some components of the KV-1. A new turret was designed, incorporating the 107-mm ZIS-6 gun. Two roadwheels and a single support roller were to be added on each side. A new 1,200 h.p. diesel engine was being developed for the vehicle, however it was not completed in time and was replaced with two V-2K engines.
Overtank offers Gun Marks for every tank, and various other services such as coaching. Interested? Visit Overtank
563
822
1100
1368











Expected
frags:
0.94
Expected
spot
1.11
Expected
defense points
0.86
Expected
winrate
52.11%












Tier VII field modification
available for tier IX-X tanks
Tier VIII field modification
available for tier X tanks
+3% to vehicle hit points
-3% to the aiming circle size
-5% to aiming speed
+3% to view range
+15% to additional stun duration
+10% to stun duration